The Modular Tekniqs process guide

How it works

Nigeria's economic steel construction process

Modular Tekniqs Process

Seven stages take your building from concept to occupancy, with one team accountable throughout.

  1. Step 01

    Design

    When going modular, it is important to commit to your modular provider and their technology early in your project to maximise efficiencies.

    Through our modular design assist, we become an integral part of your consultant team and guide them through the design process of a steel-frame modular project.

    Rendering of a three-storey stacked steel modular building with a balcony
  2. Step 02

    Supply Chain & Procurement

    Value engineering is key to everything we do. Our procurement team works with your consultant group to guide the materials specified and sourced for each project.

    Our goal is to use our global supply chain to source cost-effective, quality materials, creating cost efficiencies for our clients.

    Two modular cabins awaiting dispatch outside the factory building
  3. Step 03

    Steel Frame Fabrication

    Modular Tekniqs modules are custom assembled based on the layout and structural requirements of every project.

    Frames and light-gauge steel infill walls are fabricated with precision, with close oversight at every stage.

    Multi-storey structural steel frame under construction
  4. Step 04

    Fit-Out & Inspection

    Once module frames pass inspection, they move to the fit-out stage. With all materials in inventory at the factory, installation moves fast compared with conventional construction.

    Our QA/QC programme is rigorous, and each step of installation is checked and documented.

    Fitted-out modular office interior with desks, chairs and storage
  5. Step 05

    Delivery

    Our in-house logistics team sources cost-effective transport options for delivery to project sites.

    The entire process is managed in-house to ensure a seamless delivery to site.

    Grey steel modular cabin with windows placed on site
  6. Step 06

    Stack & Finish

    Upon arrival at site, building erection moves at a rapid pace. Our engineers specialise in modular installation, and we also work with other qualified general contractors where required.

    Once set and waterproofed, our install teams connect MEP systems, finish module seams and complete all exterior finishes on the building.

    Crane lifting a steel module frame into position on site
  7. Step 07

    Occupancy Sooner

    Occupancy can often be achieved faster than with conventional construction processes.

    Our clients reach revenue sooner and move on to the next project with their capital hard at work.

    Completed single-storey porta cabin office with windows, door and air-conditioning units on a landscaped site